Open Source Architecture Code Analyzer
-
Updated
Jul 1, 2026 - Jupyter Notebook
Open Source Architecture Code Analyzer
Grunt task to extract & inline critical-path CSS from HTML
Inline critical path CSS and async load existing stylesheets
High performance critical css extraction with a great configuration abilities
A browser widget to extract Critical CSS and Full CSS from a page. Can be used via the browser console.
MATLAB implementation of all the Operations Research algorithms and problems solved by me.
Eliminate render-blocking CSS in above-the-fold content
Client for critical-css-server. Eliminate render-blocking CSS in above-the-fold content.
Java application designed to solve the Critical Path Method (CPM) problem.
Inline critical CSS in HTML page using Puppeteer and Critical-css-parser
Get critical (above-the-fold) and the rest CSS using Puppeteer
Detects Above the Fold styles on sites and assembles a stylesheet of them.
Project scheduling and earned value control for Python: CPM, PERT with Monte Carlo schedule risk, minimum-cost crashing, EVM and earned schedule. Validated against published reference values.
Simple calculator for finding the critical path through CPM and PERT
Enumeration of all Permutations (Recursion, Single Swap, and in Lexicographic Order), and Combinations. Enumeration of all Topological Orderings on a Directed Graph. Enumeration of all Paths in a connected Graph. Evaluates Critical Path using PERT Algorithm.
Generate critical CSS path from HTML pages to enable instantaneous rendering
Time estimation MCP server for AI agents: PERT, COCOMO II, Monte Carlo, sprint forecasting, token-to-time mapping, cost estimation, and schedule risk tools.
A fast webpack plugin for inlining critical (above-the-fold) css
System that finds the critical path of the graph of the disciplines of the Computer Science course at UnB (University of Brasília).
Program for selecting vertices that have a sign of implicit transition
Add a description, image, and links to the critical-path topic page so that developers can more easily learn about it.
To associate your repository with the critical-path topic, visit your repo's landing page and select "manage topics."